Booz Allen Hamilton Integrated Cost & Schedule Risk Analysis (POLA-XX01)

Model: POLA-XX01
Booz Allen Hamilton Integrated Cost & Schedule Risk Analysis (POLA-XX01)

Booz Allen Hamilton Integrated Cost & Schedule Risk Analysis (POLA-XX01)

Model: POLA-XX01
  • INTEGRATED COST & SCHEDULE RISK ANALYSIS

$4,583.99 $5,000.00
  • Electronic Delivery

Product Description

Polaris is designed for integrating cost, schedule, and risk data into a single analytical environment w/ RealTime Analytics simulation technology to quantitatively determine ways to mitigate risk, in a single environment, through easily interpreted visua

Product Specs

Manufacturer

Booz Allen Hamilton

Manufacturer Stock No.

POLA-XX01

MPN

BAHPOLAXX01

Model#

POLAXX01

UNSPSC Code

43231500

Unit of Measure

Item Weight

0

Ships via UPS

N

Brand

Booz Allen Hamilton

Booz Allen Hamilton Integrated Cost & Schedule Risk Analysis (POLA-XX01) Reviews